Prepare the items on the picking: F-GA.ST-X14, Prepare items according to First-in/First-out system. Prepare items for a given expiration date items, picking an item with an expiration date remains less than the first. Prepare a list of items that are contained in the Raw Material, Essential Material Group (Import), Consumption Goods, Sub-Material. The date of receipt of goods, coupled with the Material sequence Tag: F-GA.ST-X09 First-In/First-Out sequence to indicate. With the exception of the Lot number control:, by Lot number or production department, as defined.
การแปล กรุณารอสักครู่..