Building officials says will cut electricity. Saturday, August 23 at 4 pm phrisa exposed to 58 to 1 hit, but it still works is A tower B elevators and interior light Lobby.
Dence and building officials to cut power Load Current Saturday, April 23, May 58 at 4 pm to the first but still use the elevator tower AB Illumination undertakings within the Lobby.
Building officials alert to cut electricity on Saturday 23 พฤษา Department 58 time 4 pm to hit 1 but that is still in use is tower lifts. A B and light within Lobby.