This research aims to optimize the workspace in the welding Department of company case studies because the operating area, with winds dropping work by wind systems equipment development.
This research aims to optimize the working area in the front of the case study. The performance space with the wind interfering with the development of the wind system.
The purpose of this research is to increase the efficiency of the area work in the welding department of company a case study Because the working area is the place the disruption by placing equipment development of wind system