The length of time taken on the steps of the quarantine until the change or repair the item to use RA for about 14 days (7 days for Bangkok Metropolitan region, 14 days)
Time to complete the process and checking the change. Or repair the product is used for about 14 days (Bangkok Metropolitan Region 7 provinces 14 days).
Performed in steps to inspect the goods until the change. Or repair the item to be used during approximately 14 days (Bangkok metropolitan 7 the country 14 day).