Shop signs design requirementsThe General principles• Who will approve only the label (Sign) that meets the objectives and installed according to the position set forth in the. Regardless of the label design, design, color and lighting to fit the atmosphere of the store, and the tenant must be proposed by a label that tells the details of size, color, material, pool, use a light installation in position in front of the store and cut in front of the shop, who rent into consideration before proceeding.• Tenants must design, installation and maintenance of their shop signs on a regular basis. By the tenant's own expense.• Who will determine the area of the tag, for the name and trademark (Logo).• Size label must be suitable for a given area and the area of the shop must be balanced with the thickness. The height and color of letters between labels different labels in the building.• Tenants must bear the label tax itself.General rules about the storefront and window.• Installation of signage, tenant or trademarks within the lease.• Photo Light Box that you want to present in front of the restaurant to offer about the store's products and services. Tenants must submit a sample image to present, for consideration before proceeding with the rental and leasing providers reserve the right to ban Photo Light Box in case of errors from those who rent.Per page 7/definitions ...- 7 -System requirementsGeneral practices.• Tenants must be responsible for the expenses for the plugged electrical. Gas pipes, water pipes, telephone lines and electricity. Water within the tenant's own stores.• Tenants must be careful of security, including a fire on all relevant assets of rent.• Tenants must be responsible for the full damage of about who to hire to perform the installation and trials of the store.• Tenants must take care of the place of performance, clean and safe, and is based on the principle of Health Ministry of health all the time.• Tenants must try to work, quiet and vibration as little can be done to cause suffering and affect other people or near the installation location.• The installation must show that use details that are required for the electrical system and other information may be about the system of rent. Is as follows:-All electrical components and installation.-Lighting-Circuit electrical wiring Electrical Wire conduit, as well as the other Way and install.-Electric load shown in the current Schedule would require Load weighing in excess of that person entered is for rent. Defined for the store.• During installation, tenants must make up the work and create a map (As-Built Drawing) show the position of the device and the connection of the device as well as any edit that appears during installation.• Tenants must have skilled technicians work in each of the systems for repair and maintenance of machinery and equipment in good condition throughout the period of the lease area.Engineering requirements.Equipment and supplies that the tenants will be installed with venting system air-conditioning – electrical, communication and sanitation systems are required to have a quality standard in accordance with the requirements of the lease as follows:• Air conditioning and ventilation systems.-Allow installation of air conditioners by putting forward (CDU) of air conditioner based on where to rent.Per page 8/...- 8 --Rental service has provided space for the installation of the CDU, for tenants by the material inside, such as air conditioning systems, air gas pipelines with tenant air power would have to perform the supply and installation of all materials and the equipment and installations according to the standard of those who rent.-Air conditioners that need to be hung in the structural engineer, design and installation, stability, strong story.-Air conditioning equipment must also be installed to reduce vibration and noise, as well as a comprehensive parts cover the device to install stable, strong.-Tenants with cooking Cook stove, frying and roasting hood must be left. Tenants will need to install the Hood are Grease Filter with the quantity of air that is sucked out compensation to Make – Up to 90% of the quantity of Air in the Exhaust Air. The way tenants will be required to supply and install the fan and duct system by material and the equipment and installations according to the standard of those who rent.-Tenants will be required to deliver the air conditioning and ventilation system, hire a monitor to consider and approve before execution.• Electrical system.-All electrical system within the area rent. A tenant who is performing.- มาตรฐาน และกฎเกณฑ์ของงานระบบไฟฟ้า ผู้เช่าจะต้องติดตั้งงานระบบไฟฟ้า ให้เป็นไปตามมาตรฐาน และกฎเกณฑ์ของการไฟฟ้าส่วนภูมิภาค และมาตรฐานการติดตั้งระบบไฟฟ้าปี 2545 ของวิศวกรรมสถานแห่งประเทศไทย (วสท.)• ระบบสุขาภิบาล- Floor Drain ทุกที่ต้องมี Filter กรองเศษขยะ หรือเศษอาหารก่อนที่จะปล่อยลงท่อน้ำทิ้ง- ผู้เช่าจะต้องดำเนินการ และติดตั้งอุปกรณ์ที่จำเป็นในร้านค้า ด้วยค่าใช้จ่ายของผู้เช่าเอง- ก่อนต่อท่อน้ำทิ้ง น้ำเสียเข้ากับระบบของผู้ให้เช่า ผู้เช่าจะต้องต่อท่อดังกล่าวผ่าน Grease Trap Tank เสียก่อน โดยการจัดหา และด้วยค่าใช้จ่ายของผู้เช่าเอง-The operation and sanitary equipment for the system inside the store, the tenant's responsibility. All expenses and operations.Front 9/gas system, ...- 9 -• Gas system.-The Assembly and installation of materials and equipment for LPG system according to the standard of those who rent.-Tenants will be required to test and monitor the gas pipe. After the installation is completed to test and verify the rent to consider and approve before execution.-In fire extinguisher systems must be installed Halon cylinders yellow type. The number of the regulation of fireระบบกันซึมลงสู่พื้นด้านล่าง ด้วยวิธีใส่แผ่นกันซึมใต้พื้นผิว หรือทายาก
การแปล กรุณารอสักครู่..