- Feedback
- Replace cabinet. And a new cabinet
- MCCB 2, 3, 4, 5 should be replaced
- the power lines have been damaged. To cut out the damaged section Cable box and make calls at the cabinet
3. Feeder one of the MDB; MCCB 225 AT / ... AF 120 Sq.mm. wire size range of this power to a group home SV2 from the dynamometer when in August 2558. as follows: Phase a = 9.5A Phase B = 4.9A Phase C = 8.8 a and Distribution Panel within the house SV2 separately as detailed below
- Student Village 2 (Single) 84 rooms, air conditioning, size 1, 220V. , 12,000 BTU number one machine
- Student Village 2 (Married) 12 rooms, air conditioning, size 1, 220V, 12,000 BTU 2 units
- from air conditioning 1, 220 V number 84 + (2 x 12) = 108 machine.
Trane air conditioners from Mitsubishi and size 1, 220 V. 12,000 BTU power while running 5.3 a (Max) is air conditioning, electrical appliances 108 1 220 V = 5.3AX 108 = 572.4A the average electricity 3. 3 = 572.4 = 190.8 a / Phase
- from the Main Breaker Feeder 1, MCCB 225 aT can also load and power lines buried in size 120 Sq.mm. a metal pipe (228A) can be loaded when required. air-conditioned, size 1, 220V., 12,000 BTU, after all.