The stage 1 installation of unmanned in vulnerable areas 6 southern provinces on the West Coast The number of 62 Phase 2 Installing unmanned in vulnerable areas around the Bay area, according to the Thai island of dense community excels in the business of tourism built 48. Stage 3 install unmanned in vulnerable areas in the province, with 57 144 number of devices associated to an alarm sound system, according to the airline and local alarm systems in vulnerable areas. 20, the number of 2292 Stage 4 consists of a scope1) install the alarm control centre provincial in 6 provinces, Andaman Sea coast. 2) install the alarm relay station station on the Andaman coast provinces 6 number of 79. 3) install the receiver alarms in six provinces in the Andaman coast is 90 days. 4 yakhao-spear and installation) in the community on the Andaman Sea coast province 6 of 24 found. 5) examining and developing unmanned, can receive broadcasting relay station by using the communication via radio frequency VHF district in 6 provinces of 79 of Andaman Sea coast. 6) install the alarm receiver satellite in 6 provinces of Andaman Sea coast features 12. Phase 5 scope consists of1) installation of alarm relay station 40 2-install Java yakhao) picks up his village's number 20. 3) adjust unmanned, with capability to receive signals from alarm relay station in the form of alarm. Through 40 days of radio Stage 6 scope consists of1) system was installed to control unmanned provincial in 6 provinces.
การแปล กรุณารอสักครู่..