Value of raw material that is lost, it has increased costs because there is a job that requires working with NG. Do I need to have new material, so there is the cost of raw materials increased.
The material losses also contributed to the cost increase as well. The NG had to produce a new one. The need for new raw material. The cost of raw materials increased.
The raw material loss is responsible for increased costs as well, because the job NG to produce a new. Make raw materials. The cost of raw material increases.