Operational risk control measure. All operational areas of potential risk. Must prepare a plan for monitoring, control risk and must be recorded in the form RM - 02 risk analysis and assessment (Risk Analysis and Evaluation)
operational risk control must be checked. And measuring the effectiveness of risk controls must be recorded and kept on file for risk management.
การแปล กรุณารอสักครู่..