2. bring all Stock comes out new checks and send the job to destroy. Based on a sample BALL MOLD inspection (XJB.) 3. staff training methods of QC/BO/OP check XJB, XB.
2. Bring all of Stock out check and send away destroyed. The reference sample inspection according to the standard BALL MOLD (XJB).3. Staff training QC / BO / OP auditing work, XJB XB.