Due to space reclamation Embankment WL1 (ITH) of Contractor B in September 2015. changing the format of the signature of the contractor to the filling in of a horizontal belt head. 1 M before the level from 640 m. (MSL), with the total quantity, all of BCM. as 252000.
การแปล กรุณารอสักครู่..
