At issue is the Eng. TSI specifies the details of how to send P/D to measure approximately 1-month duration, ACF dimension to dimension control ACF area.
The Eng., Will issue TSI will specify how to send P / D to measure the dimension ACF period of approximately one month to the control dimension ACF area.