We therefore conducted a study to improve such problems. In order to reduce the waiting time of refrigerated trucks, which will affect the patio area loads that can be used in the limit that can, and do, affect HUB based and therefore have to learn to wait to load goods. Preliminary study of the company It was found that the average waiting time for each day of waiting, waiting for loading goods.
การแปล กรุณารอสักครู่..