Moreover, according to standard operating procedures prior to construction of the access road to the wellhead owner surveyed the terrain (Topographic Survey) to store the elevation of the ground (Spot elevation) of course again. In order to prepare the Altitude (Elevation Contour) and determine where to install Ride, which will be located in areas where the elevation of the ground at a low (Low Elevation) in order to keep the flow. During the rainy season the same condition before the program was to install the pipe penetrations must have consent from the owner of both sides of the road, with the project perform the construction route. And installation of pipe penetrations to be not less than the number and size of pipe penetrations from the results of calculations based on the above evaluation design. It is therefore expected that the impact of the construction of the access road of the wellhead of the project. It is low