And in the process make the water flow weak in wide area from 08.00-04.30 on the day dawn, and the water is expected to flow normally in December 25, 2014 time 16.00.
And during this operation. Make soft flowing water in a wide area from 8:00 to 4:30 in the morning. It is expected that water will flow as normal on 25 December 2557 at 16:00.
And during this process The water supply flow light in a wide area from the time 08.00 - 04.30 the next day. And expect the water flow in the normal day 25 December 2557 time 16.00.