His Majesty he Royal remark h.m. birthday When the December 4 2536 (1993).This drought issues mean it is problem solving, this is not widely spoken, and SAG has said it would not allocate water or to cut the water supply for this city, therefore, must find a way to fix this problem, which is planned to come for many years. If today we do not need to mention the lack of water projects, especially the projects and has confirmed more than a month ago and have put the project and places even as a project that has not been solved this year or next year, but if they do well for about 5 or 6 years, water shortage problems in Bangkok will completely disappear, may think that year 6-5 for a long time. This is not the truth, and we're only trying to resolve, between pages takes. But if there is a hope that this problem is fixed, 5-6 years to they have to overcome the next life.That 5-6 this year. The fact this project began more than 5-6 years, this project is expected to tell. Don't dare say for many years, because now there will be opposition from experts from those who oppose the project. But this project is a project in the making. Although costly, not less, but if carried to another 6 years now-5 in front of us, but if this is not done in 5-6 years before they carried out the price will go up only 3 x 2 end would continue to delay and delay, when we don't have to just have to starve the water of course.Lai is a desert, we would be evacuated were not. This project is to create a national 2 reservoir is the PA SAK River is located in the Nakhon nayok River. The combination of optimal catchment enough consumed. Used in Bangkok and the nearby district of this Thai Plains. For the use of water, it must know what each one is sufficiently comfortable. An average of 200 liters per person a day if calculated that 200 liters per day, this 5 people use 1, 0 l is one cubic meter per day. If one year multiplied by 365, it means 5 people in one year, 365 cubic meters. In Bangkok and nearby we count 10 million people have taken a little bit of 10 million people, a factor it is 730 million cubic meters. Therefore we have entrapped 730 million cubic meters, the dam, we were able to serve the people in this neighborhood. People in the central region near this city forever, then there is no shortage. Pasak dam that was originally planned to hold 1, 350 million cubic meters, but the rest of it solution resolves to 750 lankwa, according to the figures provided in this one despite the pasak dam dam, enough for certain consumers. Do not dry. If more projects that will be 240 million. other cubic meters is more than enough ... ”PA SAK jolasid dam Located at Tambon Nong Bua district, Lopburi province and phran district estates development, Wang Muang, saraburi province. The project's total area is 105, 300 acres of land, which includes the OIA as follows:• Lop buri province has 96, 658 acres covers 3 municipalities, including the capital and the port district estates Development District, Amphoe Chai Badan. • Measuring จัห saraburi has 8, 642 acres is Wang Muang. PA SAK jolasid dam is an earth dam with axes type 860 metres long, 4 clay 31.50 m high water level maximum catchment + 43.00. M. a. great water storage has 960 million cubic meters.Operating budget a total of 19, 230.7900 million. The impact from the PA SAK jolasid dam can be split as follows:The population must have a population of 2, including 4 municipalities in lop buri province is developing district, capital port district and Chai Badan district estates, saraburi province, Amphoe Muang.In public buildings There are 2 wires, flood Street is the district Chai Badan-Chai Badan district and treaty district-Dan Khun thot district. Best routes in North Eastern railway Between the dancing Tiger Rapids station-station ranarai, Surat and Kaeng Khoi-BUA Yai. There are also private schools, Government and business metrics.There are environmental, cultural, and archaeological site 33 Thai community forest regions, including the boeng is valuable but non-economic.From the effects of the PA SAK jolasid dam construction. Government agencies and people involved have been collaborating, collaboration, help, in both provinces saton 2 to the electrical utility's water Street, as well as health stations, schools and temples have built the police station as a substitute of the original to the new community as well as to promote career development and management of agricultural and livestock industries in fishing households such as food processing instruction and food preservation. Sandalwood flowers and artificial flowers from shell corn and weaving with a loom dropped.Benefit from the creation of the PA SAK jolasid dam.• As the source for the consumer public in lop buri and saraburi. • Is the water source for the industry in lop buri and saraburi. • Is the water source for agriculture in the irrigation area is emerging in lop buri and saraburi. • Is the water source for the original irrigation project area. • Is the source of fresh water fishing and fish farming, a large House. • Aid for water transportation in the PA SAK River at bottom and waste water problems. • Lop buri province's economy and make the province more expansion, Sara. • Helps prevent flooding in Lopburi province and saraburi provinces, including in the area of the lower part of the Chao Phraya River. Bangkok and vicinity • Is the water source for consumer in Bangkok. • Is the most important tourist attractions.
การแปล กรุณารอสักครู่..
