Based on estimated operating expenses consultants have prepared an estimate of the project analysis throughout the 50 years since the project opened in the image that is displayed by 2567 (2024) 3.6 3.6-9 and-10.
In the preparation of cost estimates, operating a consultant has projected over the period analyzed the 50 years since the project opened to the public in 2567, as shown in Figure 3.6-and 3.6-9. 10
By setting the cost estimates in the operation research consultants throughout the project estimate analysis 50 years. Since the opening year, 2567 as shown by figure, and 3.6-9 3.6-10