(1) Contractors shall submit a form, and calculate the weight pressing down on the wheel. Accepted by the crane manufacturer's engineers. Submitted with the technical proposal on the candidates. Supply and installation of the camera system management container. The system follows the
camera system and program management •
•. Announcement system
• Alert the control center,
supply and installation of communication links. With fiber-optic communication systems. And Accessories To be able to send data to the control center. Supply and installation of the control room to the management of container. Can store image data recorded no less than 90 days
1.2 standard (STANDARDS)
standard, which the Port Authority. Used as a comparison of quality materials and practices. The
BS-BRITISH STANDARD SPECIFICATION Applying the standard, it must be equivalent to BS by.
การแปล กรุณารอสักครู่..