And engineering and maintenance was conducted. And study with MSCC MSCC to a location within the factory for a Cable Tie-in Point and Pipeline Tie-in Point and the area. It is used to set up the equipment Letdown & Metering Station of steam and demineralized water.
Engineering and maintenance and so did a survey and study with MSCC to set in the factory of MSCC for Cable Tie-in. Point Pipeline Tie-in and Point includes the .Is used in the layout of equipment Letdown & Metering Station of steam and water without minerals.