He thus had the education initiative, the Department of irrigation suitability of catchment dam built project, the PA SAK River to solve water shortage problems and relieve flooding in PA SAK khetklum.
His Royal Irrigation Department has a feasibility study of the project to build a dam catchment of the river. To tackle water scarcity and flood mitigation in the group Sak.
He had the initiative to study the suitability of the dam construction project department store under the water of the PA sak river. To solve the problem of shortage of water and flood area in group a cataract