4.1 lift up tray oil lay Rail attached to the footing. 4.2 child tray on Rails lifting oil and after chute attached to the footing and then use the Rail Rail clip. Tightening the mounting rails with Rail footing 4.3 adjust Rails on both sides, in the middle of the page BG line Rails, Rail lock clip. Tightly. 4.4 connect the Bracket forward (A or U, depending on the distance from the edge of the structure and after chute) 4.5 release Bracket the first interval put to the Rails using a Rail clip and lock tightly enough around. Both sides 4.6 release Y-gauge fitted with Rails by Y-gauge should be higher Bracket slightly. 4.7 adjusting the water level to Y-gauge, and then lock the bolt tightening to Y-gauge. 4.8 a hit tune, placing wire corresponds to the location of the head on which Mar Y-gauge when you have already used. C-clamp Bracket with wall-mounted steel grip tight, and then connecting to every concept.
การแปล กรุณารอสักครู่..