The cause of the standards laid rubber on my computer time is not clear. As a result, employees are not placed in the molds rubber tilt when the Heat press
, the resin flows to the full and is not leaking. And why the escape was not clear performance standards. As a result, the audit work
on the rubber without pulling out a piece of work examining the first time, the inspection was not all that. Since the leak
of the specimen at the edge Jig test Leak test, the machine can not detect the problem.
การแปล กรุณารอสักครู่..