During the first update (this is a point that needs to be improved urgently. It is very risky for a pool) pounded the area with a new shower rods crack collapsed along the sand. Surface leveling new tiled seating area in front of the kitchen to wash the feet. And floor tiles in the pool. The action will begin on March 7, 2016 for a period of approximately 45 days (except Saturday - Sunday), you can still use the swimming pool.
การแปล กรุณารอสักครู่..
