Project, installation and performance, the Direct Method to determine the size of 250 kg/HR of heat and increasing efficiency for combustion of the fuel cell.
The project work to install and efficiency of a Direct Method size 250 kg / hour. To determine the thermal efficiency and the optimum conditions for the combustion of the fuel cells.