Urgent Bangkok, demolishing shops, steel bridge. -To improve the landscape, in the month of Dec 58.When the area of the Canal basin bridge Oct. 27 or more steel. Mr. Phiraphong wire mould. Permanent Secretary for Bangkok Area progress of demolition of buildings Buildings that have taken the Canal and encouraged the authorities to comply with said demolition buildings that have taken almost more sink-side Canal Bridge, facing each other. Overlooking a canal. The iron bridge from the side the bridge to bridge species occupying a mightily Panu. Progress over 20 percent by the demolition of shops taken public buildings and over 100 such Klong after all this between all 498 demolition seems to work such as electrical connection of the electrical connection in each store from a neighboring House, which is not secure. Moreover, the structure of the steel is embedded into the Canal. As a result, speed and difficult. Mr p says that this Pong RA doesn't let people into areas where demolition because it might get dangerous from demolition or the dangers of electricity. In addition, Bangkok, the electricity wires so that demolition affecting people nearby. For the point at which the demolition officials not to give in to the product of the rubber traders Bangkok, until the authorities will take action, but not the issue placed on the side of the road because they will push on the old fashion house.
การแปล กรุณารอสักครู่..
