The Trang province When Aug. 12, 2015 Officials from the Center to create and reconstruct the bridge at 4 a. thung song, Nakhon SI thammarat. Department of highways number more than 40 lives, helping each other to repair highway No. 4 to Krabi-Trang-strings. The main area of the Huai Yot-Wang, 23 km range, magic. Moo 8 tambol bangkung, a. Huai Yot, which is one of the main road route from Trang province, Krabi, Phang-Nga province to Phuket and Ranong province. After several consecutive heavy rains with this path is to absorb water. Make the left side of the road slope yangboriwen the middle of the water erosion occurs. The lower body into the soil is deep, wide and 20 meters wide, 4 meters, missing both road lane until route must be closed during this period.
การแปล กรุณารอสักครู่..
