CPF team goes into reverse, with a verification system for assessment and verification system, reverse the IFFO RS standards during the second week of August, 2016.
Team CPF will assess the repeater system traceability, and configuration of the system upstream traceability standards IFFO RS during the 2nd week of August 2016.
The team CPF into assessment system verification and reflux with configurable system verification reverse standards IFFO RS during the week of August, 2 2016