And the day the poles we have made the jig jig stator housing and batang ปรั้ experiment. Stator Assembly stator and then plugged all the experimental results will be summarized and sent to the inside today.
And Saturdays ago we made the WB the jig housing jig stator assembly and test stator to the stator and the results will be summarized and sent out within days.
And the pole day past, we have the ปรั้บ set jig housing jig stator and experiment stator assembly along with stator. The professional all summary and sent today.