Shaan mint Mr. Narong Ratana (2556) conducted a study to find the area suitable for building a biomass power plant with a capacity below 10 MW of timber in Rayong. Using Geographic Information System (GeographicInformation System; GIS) and the ballast water, and the hierarchy of the diplomatic process sequence analysis (Analytic Hierachy Process; AHP) by a factor used in the analysis include the source material. The approach road and electricity transmission line. Water Support Environmental conditions And land use in analyzing the results of the research showed that the ideal location for a biomass power plant from the timber in Rayong. A more suitable area 32517.95 hectares moderate 103,055.61 488,237.04 acres and acres less suitable areas unsuitable 367,386.88 hectares, accounting for 21.35 percent, 1.42, 4.51 and 16.07, respectively, the area suitable for building a power plant to be located in the Klang.