Located away from the province to the southwest, about 20 kilometers consists of 27 village 6 District in 2 district and 1 sub Most of the project area, the land is flat, with the slope less (not more than 8).290-350 meters, covers an area of 127555 Rai, or about 204 km
.On 11 March 2535 king. He served the area area to the reservoir construction, her little girl district city pagoda, PA sang, Lamphun province.Which will also impact on water resources and environment. According to the water heart he care about the welfare and the livelihood of the people in this area. As well as the people living around.As well as the impact caused by the invasion and destruction of natural resources, such has had a Royal Black RI, summarized as follows:
.1. Consider survey project. The little girl and her reservoir construction to help the people in the district. Allocation of collateral (mum was studied), as well as the nearby water is used. To the cultivation and consumption throughout the year. For the people affected by being in the water flood. Due to the lands and housing in the area that the reservoir construction. ส.ป.A. consider supply area cater to a suitable to prevent the refugees to boiling hot
2.Watershed development you girl. To proceed in a manner joint project by using the same map The forest authorities include collateral (mum was studied.Department of irrigation, land), the office of the Special Coordinator for project that since the district office located at (). A central agency to coordinate
.
การแปล กรุณารอสักครู่..
