At the end of each work day. The drug is in the process of waiting to be packed into a carton plastic box with a lid, lay stacked on pallets located on each line, which late on 5/11/15 found water leaking from the ceiling down. Drug clearance bin at the top. The drug has been some damage
on 05/11/15 around 2:00 found water leaking from the ceiling down by the drugs that are in the process wait packed into boxes. The drug has been partially damaged.
การแปล กรุณารอสักครู่..
