The wall will be installed with a horizontal line of the wall, hit the ground and the wall surfaces of buildings, or if it is floating (not local surface-mounted) may need extra horizontal steel structure on a set, and by the approval of the supervisor or the purpose of the. Place the t-bar u along the wall that hit the line and adhere to the ground floor of the next floor, building by steel anchors the diameter is not less than 6 mm for every 600 mm. (if the floor is not building concrete or steel frame, use appropriate anchor material.)
การแปล กรุณารอสักครู่..
