Group has access to academic work and the storage of the actual working time by studying the production time and the document summarizing the results produced and the storage of the work time, from August 1 – June 31 b.e. 2557, thus bringing data analysis procedure that takes a lot of work to lose time in some production. Cause delays and process bottlenecks. In order to improve production processes from the analysis found that each process caused by most processes require workers to work primarily in the manufacturing process, there are also. With overtime, making the track is not effective. Management planning is not a good system, so the company need to profit loss should be to include. Abusive operation problem of employees.
การแปล กรุณารอสักครู่..
