And the position to install the culvert, which will have to be in the area with the elevation of พื้นดินที่ต่ำ (Low Elevation)
.In order to make the flow of water during the rainy season as state prior to the project, the installation of culvert must have the consent of the owner on either side of the street. By the project proceed to construction route.It is expected that the impact of road construction, the base pit production of the project will be in the low level.