SUPER GYRO TOWER 1 200 110 M - 80 Passengers FOR: Mr. Yapa Abdulloh Ko Chang, THAILAND OFFER NO .:-the 150609th-IAR-047 DATE: June 9th, in 2015 GYRO SUPER TOWER 1 200 / 110M - 2 - GENERAL The TOWER SUPER GYRO the 1,200th. / 110M consists of a high quality steel tubular structure with a spherical cabin for scenic viewing. Almost Tower operates this Noiselessly and requires very Little Space Ground. The Slender Tower is free standing on ITS own Foundation and the Circular Around the cabin Outside of the Tower functions Platform As a viewing. Passengers are accommodated in the cabin, which is raised and lowered while rotating slowly, thus offering full panoramic views. Outside cabin panels of Shatterproof safety Glass Protect the passengers from Wind and Weather. The cabin, fully Panoramic - the Windows in Front of the passengers As well As in the Back Wall of the Cabins offer a Breathtaking View in all directions - is built for comfortable. and at the same time efficient loading and unloading. The cabin is equipped with seat benches electric lights, telephone and a control panel for operation by an attendant. The two cabin doors, closed and opened automatically, are interlocked so that operation can not start with the doors open. The automatic operation is started and supervised by the cabin attendant. To facilitate inspection and maintenance a slow speed is part of the program. As an option (depending on the climate conditions), the cabin can be equipped with air conditioning. As an Option Also Available is an audio System. The Undercarriage of the cabin is suspended from several Steel cables, running upwards and downwards on Rails Guide and is Equipped with safety brakes. The cabin holds 80 Persons and is mounted on the Undercarriage so it Can Rotate Slowly, Driven by Electric Motors. The hoisting Machinery consists of a conventional Friction-Shave Hoist Drive Motor with Variable speed located on top of the Tower. The cabin weight and part of the payload are balanced by the counter-weight inside the tower for economical power requirement. There is a telephone Connection between the cabin and the Ground station. The Tower consist of approx. 91 m (299 ft) slender steel tube, 2,75 m (9 ft) in diameter, which is imbedded in a concrete foundation and reaches approx. 86 M (282 ft) above one thousand two hundred TOWER SUPER GYRO / 110M - 3 - Ground level. A Service Inside the Tower Ladder Leads structure up to the Machine Room on top. SUPER TOWER GYRO 1,200 / 110M - 4 - TECHNICAL DATA SUPER GYRO TOWER 1,200 of a total height of 110 M with at a Layout Drawing: RT-06-05-. 03A All Data are approximate and subject to Engineering Change during Final. Transportation and Bolted Together for Easy erection, so no WELDING is required. The main tube is equipped with guide rails, cable conduits for the traveling cable and the governor cable. A counterweight Will also be supplied. A Ladder Inside the tube and Service Guide for the Rail Attachment brackets are installed. Two (2) manholes, one on the bottom and one on the top of the tower shaft are installed. All Steel Parts are cleaned and supplied with a High resistive Two layer Painting System according to EN / ISO 12944-Class C3. SUPER GYRO TOWER 1.2 thousand / 110M - 6 - individual seats, holding up to 80 passengers. The cabin is Equipped with a Rotation. Drive, slip Rings, Two (2) Automatically operated Sliding Doors at Entrance and Exit, Inside Light, Ventilation, a Communication System and a Control Panel. A service door in the back wall of the cabin allows access to the circular catwalk and the service ladders. Will be divided in the cabin transportable Elements to be assembled by bolting on Site. As an Option, the cabin Can be Equipped with Air-conditioning System As well As an audio, whereas the costs for those options are shown under Chapter E, Options. at this time, no Budget has been considered for external illumination and / or Special theming / Decoration. A proper quotation Can be Made only after the Complete Decoration and extent have been Made Known to US. Needs to be noted that the Size and the weight of any Decoration / theming is Limited, otherwise the Thickness of the Tower structure Needs to be amended, which Will increase the overall Price of the Tower. SUPER GYRO TOWER the 1200th / 110M - 7 -. sheet metal covers, the needle on top and a manhole in the roof. The Base Plate Installation of the Machine Room is prepared for hoisting of the Mechanism. The necessary bolts for erection As well As Fixing- Other Material and shimming are included in the scope of Supply. Standards to Meet and local code requirements when different to the Standards. As the basis used for our Systems (VDE / DIN). SUPER GYRO one thousand two hundred TOWER / 110M - 8 - As an Option, Intamin Can Supply Spare Parts Package valued at an initial EURO 50'000.00. SUPER GYRO TOWER 1 200 / 110M - 9 -. A detailed Spare Parts list for the Electrical and Mechanical Equipment used on the ride Will be provided at least 3 Months before the rides Public Operation based on discussions on the level of Spares actually required. By this it is ensured that the Buyer Can Order the Needed. spare parts in time so that they arrive together with the ride at the site. If Recommended Spare Parts are not ordered or not Made Available by the Buyer during Commissioning of the ride, any Delay Due the non-Availability of such Parts and all Related Consequences is the Buyer's responsibility. Intamin's rides are designed not only to Minimise the cost of. maintenance, but also by the use of commercially available components from leading suppliers. By this and wherever possible, the buyer can generally source many parts from local suppliers. Parts which are to be replaced during Commissioning May be taken from Buyer's stocks and replaced by the Supplier free of charge. 1 1. A Dvisory S ervice - OPTION Optionally, Intamin Can offer a Package of 125 Man-days for Advisory Service, both for Installation and for the ride Testing and Commissioning As well As Training of the Operation-staff during the erection and Testing Schedule, As long. as the staff to be trained does have sufficient theoretical knowledge, extended work experience in similar fields and speaks fluently English. The number of man-days for training amounts up to 5 and is included in the above mentioned total number of 125 man-days. The cost for this Option is shown under Chapter E, Options. The Package of Man-days is considered sufficient for this Type of ride, conditional to an uninterrupted Work Progress, no delays Due to Other Work carried out Along the ride and the Installation Team. (Mechanics / Electricians), provided by the Buyer, is of a sufficient Number, English Speaking, knowledgeable and properly Equipped. Site Acceptance Test Plans Will be submitted for review and Approval. The SUGGESTED Package of Man-days includes Testing of the safety Devices, Critical Components and Monitoring Elements onsite. The Goods are fabricated according to the Factory Quality Management Plans but no tests of subassemblies at the Factory are included. The Buyer is responsible to Grant Access. to transports, heavy equipments (cranes) and suppliers personnel. The Buyer Will also Make all necessary preparations of the Construction Site, like Fencing, suitable Lay-down Area adjacent to the Installation Site (to SUPER GYRO TOWER 1.2 thousand / 110M - 10 - Amusement Park rides Can reasonably be expected to be owned by an experienced. Contractor in this field of business and therefore is not Part of Intamin's scope of Supply (no "Normal" Tools are included in this proposal). Any Specialty Tools, which are ride specific and Can not reasonably be expected in the possession of the Owner, Will. be provided by Intamin. 1 4. L Ightning P Rotection for the Internal lightning Protection Equipment supplied by Intamin is included. Not included are lightning rods however, Grounding rods, etc. SUPER GYRO the 1,200th TOWER / 110M - 11 - 1 5. TUV -. A Pproval - OPTION Intamin Will provide to the Client all documents for that particular ride necessary for the local Authority Approval. As an Option, Intamin Can provide a TUV-Approval of the Design and calculations. The cost for this Option is shown under Chapter E. , Options. 1 6. T ransportation - OPTION The cost for Transportation of Intamin's scope of Supply is not included in this proposal, but Can be Offered As an Option once the Destination, the Exact scope of Supply and the time of shipment are determined. SUPER GYRO TOWER the 1,200th / 110M. - 12 - MATERIAL AND SERVICES NOT supplied BY Intamin The following items are to be provided by others: Site Survey, Engineering and Construction of Foundations, Steel or Chemical Anchor Materials, Steel Templates, and any Other Civil Construction Work including ride Control Booth, Climate. controlled Room (s) for switchboards, etc. Local and / or Governmental Permit / Inspections / Certifications necessary for Public Operation. Approvals by an Independent Institute (German TÜV or others) of any Technical Documentation, Site Commissioning Production procedures and on. Conduits for. cables, Tubes, Electrical, hydraulic, pneumatic or Other Connection Lines between the individual Units (considered As Part of Builder's Work). Transportation Structure erection, Mechanical / Electrical / hydraulic / pneumatic equipments Installation. Advisory Service for structure erection, Mechanical / Electrical /. hydraulic / pneumatic Installation, Commissioning and Personnel Training ride. Installation Materials like Electrical cables, Transformer (if necessary), hydraulic, pneumatic (incl. air compressor) and / or other connection lines between the individual units, are not included in the material supplied. Connection and installation is to be provided by the Buyer in accordance with t.
การแปล กรุณารอสักครู่..
