4.1.2 The treated samples were then
at the end of the sewer system and simulation, using aseptic technique to prevent contamination of bacteria from the outside. Taken to the operating room by immersion in ice immediately. And wastewater sampling schedule at 10:00.
การแปล กรุณารอสักครู่..
