The purpose of the project. 1. in order to supply water for planting in the rainy season and the dry season for planting in the basin area of Kwai Noi, as well as a supplementary source of water in the dry season planting Praya project area. 2. to help alleviate flooding in the area in the lower River watershed is less now, especially in the Temple district, Amphoe mueang, and Amphoe Wang thong Church of Phitsanulok province.Project characteristics. Project type a large multipurpose dam catchment consists of Dam Noi care Dan 681 m high dam 75 meters long, 80 meters long, San, Thailand, 1260 m high dam off his low-channel 667 metres long, 16 metres which can be entrapped. 769 million cubic meters and the dam to irrigate his size 5 12.50 m wide drain channel drainage, maximum 1718 m3/sec, with a water canal water transmission line right side of big long water canal 18.80 km, and on the left side of the big long 56 km and a drainage system.