1. connect a T-Bar into the SOI T-bar domain hack.2. lock the screws tight.3. check the seams will need a Gap not exceeding 1 mm. or less in both vertical and horizontal.
1. Set the chops to the main road T-Bar T-Bar lock 2. Screw the four-way tight 3. Check Gap joints must be no more than 1 mm. Or less in both vertical and horizontal.
1. Per set. Chop SOI T-Bar along with the main T-bar.2. Lock the screw on the 4 tightly.3. Check seam. There will be no more than 1 Gap mm or less in both vertical and horizontal.