3.1 feasibility study
, the researchers conducted a study of the feasibility of the system. By conducting studies and collecting data related to the development of the
study are as follows: 3.1.1
3.1.1.1. Information about system design, database management, employees
3.1.1.2. About Database
3.1.1.3 Information systems, database management staff with the 2,010th Visual Basic
3.1.1.4 on a needs assessment is divided into two types:
a. the
message. questionnaires
3.1.1.5. Information about the design and development of
a. Context Diagram
3.1.1.6 Information about the program and use the system
a. Programming Visual Basic 2010
การแปล กรุณารอสักครู่..
