1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.3 inspection chain hoist before use, must have a good condition and other equipment intact. The sticker passed state of maintenance. And allow the use of
3 operation.4 wear PPE device with standard setting (WI-SR-001)
3.5 check height, width of material to lift, and the weight of things to lift approximately. Don't lift the material with the overload at the outside the chain set
3.6 don't hang material chain hoist lifting body 2 diagonal
3.7 vertically in the center of the set weight. Don't drag or motivate To prevent accidents that may occur from the induction of target
3.8 pull chain short, do not pull the chain hoist, long range. When the material to lift or put up because it may make gear lock drawstring
3.9. Do not use chain hoist chain knot is a knot or damaged
3.10 do not pull the chain hoist lifting material, while the 3
.11 hook lift must conform to the ear lift, Eye or SA Keung (Shackle) until the youngest of hook, do not use a chain of hook lift tie strap material to raise or lift mouth hook island. About material the lift
3.12. Do not use the lift hook no barrier (Safety lacth) at the mouth hook
3.13 while lifting material up or store, be careful not to collide with hook lifting pulley box
3.14 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable meeting planning must be thoroughly with the Department Safety
.