• To create a country for sale more water in areas where the risk is situated at the water flowing into the industrial estate area may well increase the height of the vehicles blocking the surrounding water, industrial estates has increased from 4.5 to 4 meters and water barrier to prevent cars concept back into water pipes while high tide.• Create additional drainage in order to increase the water diversion Canal into the surrounding industrial estate.• For the Canal, a concrete deck is carried out soil to water diversion from the industrial estates, faster.• Provide all Canal dredge round complete industrial estate before rainy season. • Increase the number of pumping and pushing water to accommodate in cases of delayed drainage or flooding.
การแปล กรุณารอสักครู่..