The waterfall you will run on electricity, so it must have its own power source outlet. Invite waterfall construction should be performed by a balcony. The rooftop terrace if you don't have a middle outlet would need to be a certified electrical installation.Remove all weeds in the area where you will be able to dig for your pond. Make sure that the lining is measured level areas so you can dig a hole big enough to hold. Just switch MOP and tracked around on the ground and then start digging.The depth of the hole should be the same depth as the lining, and the diameter is close to the actual diameter of the bag is a good insurance policy you fit. If you find your hole less than a big bag. Just specify in the sandThe sand can also be used at the bottom of the hole because the ground, sand, steady play with a height of preformed health put about an inch of sand. The rim of the preformed liner stands about an inch above ground level-help reduce the amount of dust that will make Tok a pond's waterfalls. You will be able to push the sand around to get the level of preformed liner. Next Make a hole in the preformed liner pond waterfall. For levelness by placing a Carpenter's level to the left, right, front and back-by reading that you get from being a Carpenter level. This nachut that you will need to remove the lining from the preformed holes and a fine layer of sand by.
การแปล กรุณารอสักครู่..