The design Orifice plate by modeling the flow of water at high pressure through Orifice plate then analyzed by program Solidworks Flow Simulation 2013, and then perform Orifice plate that suits the user best.
In compliance with the above will result in the damage of tube Orifice plate on the back. And reduces the cost of maintenance, with
the second part is the preparation of the water balance of the Kaeng Khoi 2 power plant. Using the information gathered from various sources. Kaeng Khoi 2 power plant which has been approved by the Department of Irrigation to 10 can use the river water for up to 54,400 cubic meters / day. And sewage from the plant up to 10,000 cubic meters / day
of preparation of the water balance is for sure. Water that enters the plant was put into use in some activity. Water the plant out to the channel does. And water - from the factory with an equal amount or not.