Work area into a PM 1,240 square meters.Price total material labor contractor Into a beam ceiling, steel tie pour flooring Y-grille mate .4 mm steel eyes away 25 cm.
Poured a local area 1240 square meters total Price of construction materials and labor poured into a tie steel beams, ceiling surface. Rack failure - Metro steel. 4 mm. The eye is 25 cm.
Is a God, on 1 240 square meters.Contractor price include material with labor.The binding of iron into a tech ceiling surface to realize you wan - matrix.Steel. 4 mm eye away 25 cm.