5.3.3 the 5th month, consultants will have to put forward the report (Interim Report), must report to work. Problems, obstacles, suggestions and that needs to continue. 10-Pack with CD-ROM 2.
5.3.3 Within five months, the consultant will be required to report the (Interim Report) will be reporting to the problems of the past recommendations. And work to be done following a set of 10 discs with CD-ROM 2 series.
5.3.3 within months 5 consultant must taken to central report (Interim Report) to report to work through problems. Various suggestions and to continue the 10 set with a sheet CD-ROM 2 series.