Moreover, during the year-2579 require 2558 (2015) purchase of electricity from the VSPP (AEDP plan) total electricity generation capacity of 9 megawatts, 735.6. As renewable energy group total capacity, megawatts of electric-9701. The production system of electrical and heat energy (Cogeneration) integrated electrical capacity 34.6 megawatts.
การแปล กรุณารอสักครู่..
