Drilling the hole production test (at least 3 holes) Petroleum quality inspection/calculation of quantity of book/the quantity to be produced each day to design production planning and production platform with the
Drilling experiments (at least 3 holes) Inspection Petroleum / calculate the amount of the reserve. / Quantities to be produced each day. platform to design and production planning.
The drilling of wells trial production (at least 3 holes). To check the quality of Petroleum / calculate the amount of reserves. / quantity to produce on a daily basis to design and planning, production processing platform