Sequence 5: products that are not accepted during leak check with electronic (Electronic Testing).After checking the leak with e-select products Then, it was found that the product does not leak tested in accordance with the need. To check the leak with a new e-select products and must be leak tested according to the standard again. If the results of the audit criteria are accepted, it will be sent through to the next step of the process (in the case of condoms condom non-smooth surface. Can be processed twice). Scrap percentage from the audit have been noted in the Register if the day which Reject the amount of damage from the leak monitoring from more than 7.5% ET must make a report to edit, and the Edit protection to manage. If any of the baskets failed (because I found leakage holes) at the checkpoint before the package ฟอล์ย (Pre-foiling qualification) to import no more than twice new ET if it is not yet over, is considered scrap and quality control department head. Will need to make a correction and prevention report to edit further.