1. lift the leader door, head in the up position on the Transom and lock nut enough tension tool.2. lift the door in the door into the Groove on the nut holder 13 extension, then do the same with another door pane.3. adjust the spacing area, according to the standard lock nut tightly.4. bring the arms of par goals lifted to assemble with nut locks with a leader head, tightly.5. release the door installation, door partition in the opening period and then adjusting the water level check the standards provided. When the bolt locks, and then tightly
การแปล กรุณารอสักครู่..
