History of key projects.Key projects. As a concept in the building of the king to solve the flood. By he aware of the severity of floods in Bangkok, the 2538 thus is initiative "key projects". On 14th November now, by providing a place to store water to various points in Bangkok to draw up temporarily. When the canal to the drainage then drainage from the hold out. So it can reduce the flood problem.However, besides key projects is to help drainage. To reduce the severity of flooding problems in the Bangkok metropolitan area and vicinity. Will also help conserve water and the environment, the water is stored on the ระบายสู่ preprandial going to therapy of operas to dilute. And finally, these waters will push water to drain out.The concept of key projects.The concept of key projects. Due to the king. A royal to monkeys and bananas in the cheek bulge at a time came very much. The current king explained. "Monkey generally if we send the banana monkey will be peeled, put it in his mouth to chew, and stored on the cheek. The monkey to do this until all the banana comb or full cheek bulge. Then will gradually carry out chew and กลืนกิน later "Royal, was born. "Key projects". To create areas contained water. In waiting for the drain, for use later.Characteristics and methods of key projects.The characteristics of key projects will proceed from the upper drainage area To drain the water into the bay water stay at the seaside. Then, when the sea level dropped to lower than in a canal. Canal will flow into the sea, naturally. Then they started pumping out canal act plutonium to make water when on the slowly flowing, thus causing flood decreased. Finally, when the sea level was higher than the levels in the canal. Then closed the floodgate by waters down างเดียว (One Way Flow).The type of key projects.
การแปล กรุณารอสักครู่..